0+solar pumps installed 0districts served MTSKPYempanelled PM-KUSUMComponent B & C 0+years on ground

Clean energy for a brighter tomorrow

Solar that works,
across Maharashtra.

Aadya Green installs solar pumps and rooftop solar. Over six thousand pumps across rural Maharashtra, rooftops from Parbhani to Pune, and now taking the same work to housing societies in Pune and Mumbai.

Empanelled installer for

What we build

Three things we do well.

01

Solar water pumps

AC and DC submersible and surface pumps from 1 HP to 10 HP, sized to your borewell and crop. Empanelled with Shakti, Ecozen and Surya International, and delivered under MTSKPY and PM-KUSUM.

  • Borewell survey & head calculation
  • Panel array design and MPPT sizing
  • Foundation, mounting & commissioning
  • 5-year full warranty support
02

Rooftop solar for homes

On-grid systems from 3 kW to 20 kW for independent homes. We handle DISCOM approvals, net-metering paperwork and MNRE subsidy claims from start to finish.

  • Shadow analysis & generation estimate
  • Tier-1 modules, IEC-certified inverters
  • Structure design for local wind loads
  • Bill-in-hand payback report
Now expanding
03

Rooftop solar for societies and commercial

We built a 45 kW commercial rooftop in Pune and have a decade of larger project work behind us. That same team now takes on housing societies and small industry across Pune and Mumbai.

  • Feasibility for 20 kW to 500 kW systems
  • Society AGM and MSEDCL / Adani / Tata Power liaison
  • Group-captive and OPEX models where they fit
  • Remote monitoring, annual cleaning and O&M contracts

Government schemes we deliver

Paperwork done right, the first time.

Subsidised solar is not only about installing panels. Getting through the scheme documentation without losing months is half the job. We’ve done it over 2000 times.

Central · MNRE

PM-KUSUM

Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan

Off-grid standalone solar pumps for farmers who don’t have a reliable grid connection. Central and state subsidy together cover about 60% of the system cost, and the farmer pays roughly 40%. We handle benefit-transfer paperwork, borewell verification and the post-commissioning survey.

ComponentB & C
Pump range3–10 HP
Farmer share~40%
Maharashtra · MEDA

MTSKPY

Magel Tyala Saur Krushi Pump Yojana

Maharashtra’s flagship solar-pump programme, run through MEDA and MSEDCL. Farmer contribution can be as low as 5 to 10% for SC/ST beneficiaries. We handle the online application, document verification and the post-installation joint inspection.

AuthorityMEDA
Pump range3–7.5 HP
Farmer share5–15%

Where we work

Based in Marathwada, working across Maharashtra.

Parbhani Beed Latur Jalna Sambhajinagar Nanded Dharashiv Pune Mumbai Nashik
  • Active installations: Parbhani, Beed, Latur, Jalna, Sambhajinagar, Nanded, Dharashiv
  • Expansion 2026: Pune, Mumbai, Nashik

We started with solar pumps in Marathwada, where erratic power and deep water tables make a farmer’s day harder than it should be. Ten years on, we take the same approach to rooftops in Pune and Mumbai: a proper site survey, honest sizing, and clean commissioning.

Own a plot, home or society in Maharashtra outside these districts? We travel. Ask us.

Selected work

Thousands of pumps, and rooftops adding up.

Solar pump · MTSKPY · Beed cluster

412 pumps across 34 villages

A three-district rollout for Shakti Pumps under MTSKPY. 5 HP AC submersibles for sugarcane and cotton growers, with joint inspection cleared inside the same season.

Rooftop · Residential · Parbhani

10 kW on-grid, net-metered

Family home. Monthly bill dropped from ₹4,800 to ₹280. Full DISCOM approval and subsidy claim closed in 42 days.

Rooftop · Commercial · Pune

45 kW warehouse installation

Logistics facility off Nagar Road. Group-captive model with a projected 4.1-year payback, and live monitoring via the inverter portal.

Solar pump · PM-KUSUM · Latur

7.5 HP for a fig orchard

Deep borewell at 220 ft with variable draw. MPPT tuning kept the pump running through peak-summer voltage sag.

For housing societies in Pune and Mumbai

Cut your common-area bill by half or more.

Lifts, pumps, corridor lights, the guard cabin: the society bill keeps climbing every year. A well-designed rooftop solar system on your terrace can offset most of it, with a 4 to 5 year payback and 25 years of near-free generation after that.

Our record so far: over 6000 solar pumps under MTSKPY and PM-KUSUM, rooftop residential jobs across Marathwada, and a 45 kW commercial rooftop running live in Pune. The same crew now takes on your society.

We handle the full journey: feasibility, society AGM presentation, MSEDCL / Adani / Tata Power net-metering, installation and performance monitoring.

Request a society feasibility report

Rough estimator

Slide to match your society’s monthly common-area bill.

₹ 30,000
Suggested system 20 kW
Est. project cost ₹ 11,00,000
Est. monthly saving ₹ 24,000
Payback 3.8 years

Indicative only. Actual sizing depends on terrace area, shadow, tariff slab and load pattern. Ask us for a detailed report.

How we work

Five steps, nothing hidden.

  1. 1

    Site visit and survey

    Free anywhere in Maharashtra. We measure shadow, roof condition, load pattern or borewell head, whichever applies.

  2. 2

    Design and quote

    A right-sized system, itemised BOM, generation estimate and a payback report you can share with your family or society.

  3. 3

    Paperwork and approvals

    DISCOM application, net-metering, MNRE subsidy claim, or scheme benefit transfer. We fill the forms, you sign.

  4. 4

    Installation and commissioning

    Our own crews, tier-1 modules and IEC-certified inverters. A typical rooftop takes 3 to 5 days, a pump usually one day.

  5. 5

    Monitoring and O&M

    Remote generation monitoring, annual cleaning, and a phone call away for the life of the system.

Talk to us

Tell us about your roof. We’ll take it from there.

A short call and a site visit is usually all it takes to know whether solar makes sense for you. Both are on us.

We reply within one working day.